YUSHUNXIN / CONFIRMED PROJECT CASE

Botswana Complete Organic Fertilizer Line

The project required one coordinated package from compost handling through finished-product packing.

MARKETBotswana
APPLICATIONAgriculture & livestock
CAPACITY / SCALEComplete line
SPECIALIST BRANDYUSHUNXIN

PROJECT CONTEXT

The operating requirement behind the system.

The project required one coordinated package from compost handling through finished-product packing. The final engineering basis was reviewed against site conditions, operating resources, required output and the intended downstream process.

DECISION INPUTS

What had to be confirmed

01Organic feedstock
02Moisture
03Capacity
04Pack format

DELIVERY BOUNDARY

Configured system scope

01Loader feeder
02Conveyors
03Crusher
04Screens
052 m disc granulator
06Packer
07Controls
08Compost turner

VALIDATION EVIDENCE

“The customer confirmed satisfaction; site evidence is recorded.”

Published from the confirmed transaction record with personal identities and exact commercial values removed.

PROJECT-SPECIFIC REVIEW

Translate this reference into your design basis.

Capacity, utilities, layout, local standards, product specification, schedule and the responsibility matrix must be reconfirmed for every new project.