Defined application and measurable target
Use when the input, output or visitor objective and the expected delivery role can be stated.
Find my route ↗
YUSHUNXIN Environmental / PRODUCT PROFILE
High water or grit loading can move the bottleneck away from the reactor. Confirm upstream conditioning and downstream residue criteria before fixing thermal capacity.

APPLICATION & PROJECT FIT
Typical decision teams include oilfield service companies refineries and tank-farm operators industrial waste treatment contractors. Suitability is confirmed after the operating objective, site basis and required delivery scope are reviewed.
ENGINEERING BASIS
The design basis is the sludge assay: water, oil, solids, ash, chlorides and entrained grit. These values determine dewatering or drying duty, reactor residence time, condensation load, recovered-oil separation, non-condensable-gas handling and the acceptance route for treated solids. Guaranteed throughput and oil recovery require representative laboratory data and a defined operating schedule.
DELIVERY SCOPE
Civil works, local permits, utilities, unloading, installation labor and third-party interfaces are identified in the project responsibility matrix before order confirmation.
PROJECT GATES
Product, capacity, users, site, standards and commercial objective.
Model, process, layout, interfaces, utilities, controls and options.
Drawings, exclusions, responsibilities, quality controls and schedule.
Manufacture, shipment, installation support, commissioning and training.
TECHNICAL-COMMERCIAL REVIEW
Share the operating basis and site conditions to receive a defined equipment route, supply boundary and delivery plan.
Start project review ↗SELECTION CHECK
This profile is a decision starting point. The proposal must record the valid operating range, included modules, acceptance basis and excluded site responsibilities.
Use when the input, output or visitor objective and the expected delivery role can be stated.
Provide the realistic operating range so controls, margin and interfaces are not selected from one ideal value.
Controls, auxiliaries, drawings, testing, installation, commissioning and local works must be compared separately.
PRODUCT-SPECIFIC QUESTIONS
Input composition and contamination range is the first selection variable; it must be reviewed together with recovery target and recovered-product route.
Rated basis, included modules, materials, controls, interfaces, utility demand, documents, tests, delivery terms, exclusions and acceptance method.
After the design basis, scope boundary, options, project country, site responsibility and schedule assumptions are aligned.
USEFUL INQUIRY INPUTS
Add the project country, preferred schedule and required commissioning scope.
Prepare my configuration ↗